ADDITIONAL 1500KVA SUB-STATION

Projects

ADDITIONAL 1500KVA SUB-STATION

A Metal Foundry on the verge of expansion required an addtional 1500KVA Sub-Station.
After a complete site survey, we built Sub-Station Base, Electrical Room and ACB Housing.
We designed the Load Schedule, Circuit Diagram, Single Line Diagram and HV and LV Transmission route. 
We supplied and installed LV Cables and Switchgears for power distribution in the entire factory. 
 
It was a complete turnkey project.