ADDITIONAL LOAD AND POWER DISTRIBUTION

Projects

ADDITIONAL LOAD AND POWER DISTRIBUTION

Online company dealing in health supplements wanted to maintain a 24 Degress Celsius Temperature throughout the store. Evaluated the existing load and applied to DEWA for additional load. Distributed the load proportionally throughout the warehouse for A/C unit. 

Whatsapp